Projects
Panels were installed and fixed to the lift shaft opening, aligned to the correct lines and levels, and finished flush to match the surrounding works. Fixings were checked and the completed work inspected for compliance before handover.
Screen installation has been completed for the remaining two shafts as part of the Kone lift works. Screens were fitted, aligned and secured in line with the specification, with fixings checked and the finished work inspected to confirm compliance before handover.
Architrave installation has been completed on the project. Architraves were fitted, aligned and secured to the required lines and levels, with joints and finishes checked to ensure a neat, uniform appearance. All work was inspected to confirm compliance with the specification before handover.
The bronze arch surrounds have been completed, with gold piping fitted to frame the panels neatly. Panels were aligned and secured to the required lines and levels, joints checked for consistency, and the finished work inspected to confirm a uniform appearance before handover.
Careers
Terms of Service
Blogs
About Us
Projects
Privacy Policy
Unit 18 Little Mollands Farm, Mollands Lane, South Ockendon, Essex, England, RM15 6RX
01708 321 023
© 2026 PSG Lift Services. All rights reserved. Created by MAPTEC IT.
This website uses cookies to provide you with the best browsing experience.